{"id":298,"date":"2012-10-20T09:50:12","date_gmt":"2012-10-20T07:50:12","guid":{"rendered":"http:\/\/www.tienda40.es\/construccionesrico\/?page_id=298"},"modified":"2024-07-17T18:39:59","modified_gmt":"2024-07-17T16:39:59","slug":"refurbishment-of-the-dam-on-the-river-guadaletin-y-rambla-del-tiata-en-lorca-murcia","status":"publish","type":"post","link":"https:\/\/www.construccionesrico.com\/en\/civil-works\/refurbishment-of-the-dam-on-the-river-guadaletin-y-rambla-del-tiata-en-lorca-murcia\/","title":{"rendered":"Refurbishment of the dam on the river Guadalet\u00edn and Rambla del Tiata in Lorca (Murcia)"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The work consisted of the construction of a dam with he following attributes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Site excavations for the structure:<\/strong>\u00a0111.980 m3<\/li>\n\n\n\n<li><strong>Concrete in the foundations and related structures:<\/strong>\u00a028.913 m3<\/li>\n\n\n\n<li><strong>Formation of straight and curved walls:<\/strong>\u00a019.775 m2<\/li>\n\n\n\n<li><strong>Steel tubing:<\/strong>\u00a0372.658 Kg<\/li>\n\n\n\n<li><strong>Ml Piling of reinforced concrete (Diameter 100 cm):<\/strong>\u00a0967 ml<\/li>\n\n\n\n<li><strong>Ml Piling of reinforced concrete (Diameter 0.65 cm):<\/strong>\u00a01.651 ml<\/li>\n\n\n\n<li><strong>Screen of reinforced concrete:<\/strong>\u00a02.493 m2.<\/li>\n\n\n\n<li>2 Sluice gates (Taintor) measuring 8.75\u00d75.00 m2 with hydraulic action<\/li>\n\n\n\n<li>Double faced concrete wall with masonry pointing to a height of 4 metres with a cemented infill of cyclopean concrete (concrete in which large rocks are embeded) to a depth of 2 metres: 2.008 ml<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Type of project:<\/strong>&nbsp;Civil works<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The work consisted of the construction of a dam with he following attributes: Type of project:&nbsp;Civil works<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"wp-custom-template-page-wide-width-search","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[],"class_list":["post-298","post","type-post","status-publish","format-standard","hentry","category-civil-works"],"_links":{"self":[{"href":"https:\/\/www.construccionesrico.com\/en\/wp-json\/wp\/v2\/posts\/298","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.construccionesrico.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.construccionesrico.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.construccionesrico.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.construccionesrico.com\/en\/wp-json\/wp\/v2\/comments?post=298"}],"version-history":[{"count":2,"href":"https:\/\/www.construccionesrico.com\/en\/wp-json\/wp\/v2\/posts\/298\/revisions"}],"predecessor-version":[{"id":3555,"href":"https:\/\/www.construccionesrico.com\/en\/wp-json\/wp\/v2\/posts\/298\/revisions\/3555"}],"wp:attachment":[{"href":"https:\/\/www.construccionesrico.com\/en\/wp-json\/wp\/v2\/media?parent=298"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.construccionesrico.com\/en\/wp-json\/wp\/v2\/categories?post=298"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.construccionesrico.com\/en\/wp-json\/wp\/v2\/tags?post=298"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}