Refurbishment of the dam on the river Guadaletín and Rambla del Tiata in Lorca (Murcia)

Description:

The work consisted of the construction of a dam with he following attributes:

  • Site excavations for the structure: 111.980 m3
  • Concrete in the foundations and related structures: 28.913 m3
  • Formation of straight and curved walls: 19.775 m2
  • Steel tubing: 372.658 Kg
  • Ml Piling of reinforced concrete (Diameter 100 cm): 967 ml
  • Ml Piling of reinforced concrete (Diameter 0.65 cm): 1.651 ml
  • Screen of reinforced concrete: 2.493 m2.
  • 2 Sluice gates (Taintor) measuring 8.75×5.00 m2 with hydraulic action
  • Double faced concrete wall with masonry pointing to a height of 4 metres with a cemented infill of cyclopean concrete (concrete in which large rocks are embeded) to a depth of 2 metres: 2.008 ml

Type of project: Civil works