This project involved the construction of an underground car park below the surface of Avda. del Brasil, in the municipality of Torrejón de Ardoz, with a surface area of 5,724.51 m2. The building extends over three underground floors with
The work involved the construction of an underground car park between the Avda. del Brasil, calle Paracuellos and calle del Cura, in the municipal district of Torrejón de Ardoz. The building has three underground floors with a total of
The project involved the construction of four underground car parks in the streets of Cuenca, Abogados de Atocha, Dolores Ibárruri and Gabriel García Márquez in the municipality of Rivas Vaciamadrid:
LOCATION | NUM. SPACES | SURFACE AREA | TOTAL BUILT AREA |
---|---|---|---|
C/ |
The work consisted of the construction of an underground parking area next to the FFCC station in Colmenar Viejo. The parking area has a capacity of 1.850 parking spaces which are distributed over three floors and represent a total
Work involved the complete construction of a building destined for use by the local Council. The structure of the building was of reinforced concrete with metal supports in prefabricated joists and block work of vibrated concrete.
The
The programme of work involved the construction of a building for social and community usage spanning three floors (basement, ground and first floors) with a structure of pillars and unidirectional beams and a slate gabled roof. The project featured
Work involved the complete construction of a dedicated storage depot, built on footings and bracing beams of reinforced concrete with laminated steel porticoes and using reticular forged concrete. The depot was enclosed with panels of phenolic resin and pre-treated
Work consisted of the rehabilitation of 77 modular residential properties in the municipal district of Galapagar focusing on repair and replacement of the facade. Other works involved the creation of new enclosed areas and attention to coverings, waterproofing facades
The work involved the construction of a swimming pool and a service building of reinforced concrete. The total built area covered 1.280 m2. The project involved excavation work, creation of the swimming pool basin, concrete walls, waterproofing and the
The project involved the entire construction of a sports complex, including a swimming pool, changing area and service annex, as supporting utilities. The total built surface area was 2,602 m2. It included excavation work, creation of the swimming pool